Mission and Requirement
Confirm the mission need, sponsoring organization, users, classification, and operational requirement.
Conversion of Existing Space · Permanent · TS/SCI
Internal workflow coordination information. This information is excluded from the public community directory.
Track approvals, documents, evidence, construction, inspections, and package readiness.
Confirm the mission need, sponsoring organization, users, classification, and operational requirement.
Identify the cognizant security authority and accrediting organization and establish coordination.
Develop the facility concept and applicable pre-construction information for authority review.
Evaluate the surrounding environment, threats, vulnerabilities, and required countermeasures.
Develop and route the construction security plan before applicable construction begins.
Validate the planned perimeter, openings, penetrations, utilities, acoustics, and security systems.
Determine applicable TEMPEST requirements and document the CTTA review.
Track construction against the approved design and collect evidence throughout execution.
Install, test, and document intrusion detection, access control, locks, and related systems.
Complete the facility checklist using the verified as-built condition.
Complete the SCIF SOP, emergency plan, procedures, and supporting operational records.
Assemble approvals, drawings, test results, waivers, photographs, and supporting evidence.
Inspect the facility, record deficiencies, and resolve or formally address discrepancies.