DIA SCIF Accreditation Bot Agentic Accreditation Support
DEMONSTRATION ENVIRONMENT
← Return to mission paths
EXISTING SCIF BASELINE

DAO X-Ray

DB-99-999 · Operational · TS/SCI

100% BASELINE READINESS
DEMO RECORD This environment is intended for representative unclassified data.
BASELINE GOVERNANCE

Human baseline validation and acceptance

OPEN BASELINE VALIDATION →
READINESS EXPLANATION

Why this baseline is 100% ready

Administrative fields contribute 85 points. Three required document groups contribute 5 points each.

100% 85 field points + 15 document points
Required fields 13 / 13
Document groups 3 / 3
Missing fields 0
Points remaining 0
BASELINE READINESS COMPLETE All required administrative fields and document groups are present. Human validation is still required.

Readiness measures package completeness only. It does not represent accreditation, approval, compliance, or acceptance. Final determinations remain with the designated human authority.

FACILITY LIFECYCLE

Controlled SCIF decommissioning

Initiate facility closeout, collect evidence, obtain human approval, and create the final decision record.

OPEN DECOMMISSIONING →
FACILITY IDENTITY

Baseline profile

Sponsoring organization
DIA
Facility type
Permanent
Location
X-Ray, Not provided
Country
Armenia
Cognizant authority
DIA
AO organization
SEC3
ACCREDITATION CLOCK

Revalidation status

1518 days remaining Accreditation is within its recorded period.
Original accreditation
2026-01-12
Expiration
2031-01-11
Last inspection
2026-01-26
DOCUMENT LIBRARY

Existing artifacts

TEST_-_Diagrams_and_Photos.docx SCIF SOP / Emergency Plan Package
22.5 KB
TEST_-_FFC.docx Fixed Facility Checklist
22.5 KB
TEST_-_Concept_of_Approval.docx Accreditation Letter
22.5 KB
TEST_-_Diagrams_and_Photos.docx Design or Drawing
22.5 KB
AUDIT HISTORY

Recent activity

SELF_INSPECTION_REVIEW_ACCEPTED Inspection 11: Submitted -> Under Review by A2 2026-09-28 14:52:43
SELF_INSPECTION_SUBMITTED Inspection 11: Draft -> Submitted by Nicholas Linehan 2026-09-28 14:52:27
INSPECTION_ITEM_UPDATED Facility Management set to Compliant; readiness 100% 2026-09-18 02:45:40
INSPECTION_ITEM_UPDATED SOP and Documentation set to Compliant; readiness 100% 2026-09-17 17:51:02
REVALIDATION_CHECKLIST_UPDATED Facility Baseline set to Complete; readiness 100% 2026-09-17 15:18:19
WORKFLOW_COMPLETED existing-scif 11: Approved -> Completed by Schmittle (by DeSantis) 2026-09-17 09:05:20
WORKFLOW_APPROVED existing-scif 11: Under Review -> Approved by Schmittle 2026-09-17 09:05:07
WORKFLOW_REVIEW_ACCEPTED existing-scif 11: Submitted -> Under Review by Schmittle 2026-09-17 09:04:58
WORKFLOW_SUBMITTED existing-scif 11: Draft -> Submitted by DeSantis 2026-09-17 09:04:53
BASELINE_READINESS_RECALCULATED Baseline readiness recalculated to 100 percent 2026-09-17 09:04:20
BASELINE_DOCUMENT_UPLOADED SCIF SOP / Emergency Plan Package uploaded by DeSantis: TEST_-_Diagrams_and_Photos.docx 2026-09-17 09:04:20
BASELINE_READINESS_RECALCULATED Baseline readiness recalculated to 95 percent 2026-09-17 09:03:55
BASELINE_DOCUMENT_UPLOADED Fixed Facility Checklist uploaded by DeSantis: TEST_-_FFC.docx 2026-09-17 09:03:55
BASELINE_READINESS_RECALCULATED Baseline readiness recalculated to 90 percent 2026-09-17 09:03:33
BASELINE_DOCUMENT_UPLOADED Accreditation Letter uploaded by DeSantis: TEST_-_Concept_of_Approval.docx 2026-09-17 09:03:33
INSPECTION_ITEM_UPDATED Facility Changes set to Compliant; readiness 100% 2026-09-17 09:00:58
INSPECTION_ITEM_UPDATED SOP and Documentation set to Compliant; readiness 92% 2026-09-17 09:00:51
INSPECTION_ITEM_UPDATED Emergency Planning set to Compliant; readiness 84% 2026-09-17 09:00:44
INSPECTION_ITEM_UPDATED Classified Storage and Destruction set to Compliant; readiness 76% 2026-09-17 09:00:36
INSPECTION_ITEM_UPDATED TEMPEST and Technical Security set to Compliant; readiness 66% 2026-09-17 09:00:29