DIA SCIF Accreditation Bot Agentic Accreditation Support
DEMONSTRATION ENVIRONMENT
← Return to mission paths
EXISTING SCIF BASELINE

VINCE JWICS CAFFE

CE-27-001 · Accredited · TS/SCI

78% BASELINE READINESS
DEMO RECORD This environment is intended for representative unclassified data.
BASELINE GOVERNANCE

Human baseline validation and acceptance

OPEN BASELINE VALIDATION →
READINESS EXPLANATION

Why this baseline is 78% ready

Administrative fields contribute 85 points. Three required document groups contribute 5 points each.

78% 78 field points + 0 document points
Required fields 12 / 13
Document groups 0 / 3
Missing fields 1
Points remaining 22
Missing administrative information
  • Accreditation expiration date
COMPLETE ADMINISTRATIVE INFORMATION →
1
MISSING · 5 POINTS

Accreditation Letter

Current approval or accreditation determination.

2
MISSING · 5 POINTS

Fixed Facility Checklist

Current Fixed Facility Checklist or approved equivalent.

3
MISSING · 5 POINTS

SCIF SOP / Emergency Plan Package

A combined package, or both the SCIF SOP and Emergency Plan.

CLOSE A READINESS GAP

Upload a required baseline document

Maximum 10 MB · Approved demo data only

Readiness measures package completeness only. It does not represent accreditation, approval, compliance, or acceptance. Final determinations remain with the designated human authority.

FACILITY LIFECYCLE

Controlled SCIF decommissioning

Initiate facility closeout, collect evidence, obtain human approval, and create the final decision record.

OPEN DECOMMISSIONING →
FACILITY IDENTITY

Baseline profile

Sponsoring organization
USCENTCOM
Facility type
Permanent
Location
Potato, Idaho
Country
United States
Cognizant authority
CENTCOM
AO organization
DIA
ACCREDITATION CLOCK

Revalidation status

Date required No expiration date was entered.
Original accreditation
2001-11-02
Expiration
Not provided
Last inspection
2026-03-04
DOCUMENT LIBRARY

Existing artifacts

No baseline documents have been uploaded.
AUDIT HISTORY

Recent activity

WORKFLOW_COMPLETED existing-scif 19: Approved -> Completed by JUAN SOTO 2026-11-13 13:47:33
WORKFLOW_APPROVED existing-scif 19: Under Review -> Approved by JUAN SOTO 2026-11-13 13:47:20
WORKFLOW_REVIEW_ACCEPTED existing-scif 19: Submitted -> Under Review by JUAN SOTO 2026-11-13 13:47:14
WORKFLOW_SUBMITTED existing-scif 19: Draft -> Submitted by HERNANDEZ HERNANDO 2026-11-13 13:47:07
EXISTING_SCIF_REGISTERED Existing SCIF baseline created with 0 uploaded document(s) 2026-11-13 13:46:21