Facility Management
Validate accreditation records, responsibilities, access rosters, training, and required reviews.
TestSCIF2 · 2026-09-15 · Completed
Open the controlled human review workflow. Inspector and reviewer separation is required.
Record the condition and an unclassified observation for each area.
Validate accreditation records, responsibilities, access rosters, training, and required reviews.
Inspect perimeter integrity, walls, floors, ceilings, openings, and observable damage or modification.
Inspect entrance doors, emergency exits, locking devices, hardware, hinges, and access procedures.
Review IDS coverage, testing, maintenance, alarm response, records, and service documentation.
Review authorization, visitor control, badges, records, escorts, and access-control equipment.
Review communications equipment, cabling, penetrations, equipment changes, and approved configurations.
Inspect observable conditions affecting acoustical protection and documented mitigation requirements.
Confirm applicable CTTA or TEMPEST documentation and identify configuration changes requiring review.
Review storage authorization, containers, end-of-day procedures, and approved destruction capability.
Review emergency plans, contacts, evacuation procedures, exercises, and emergency access provisions.
Verify the SCIF SOP, Fixed Facility Checklist, approvals, waivers, diagrams, and supporting records.
Identify mission, construction, system, occupancy, co-use, classification, and operational changes.