DIA SCIF Accreditation Bot Agentic Accreditation Support
DEMONSTRATION ENVIRONMENT
← Return to facility
Annual Self-Inspection

def

demo-scif-001 · 2026-09-15 · In Progress

71% INSPECTION READY
LEAD INSPECTOR bob the builder
AREAS REVIEWED 9 / 12
OPEN FINDINGS 1
COMPLETION GATED
INSPECTION COMPLETION GATE ACTIVE Review all twelve areas and close deficiencies before final human validation.
HUMAN REVIEW GATE

Submit, review, approve, and certify

Open the controlled human review workflow. Inspector and reviewer separation is required.

OPEN HUMAN REVIEW →
INSPECTION MATRIX

Facility review areas

Record the condition and an unclassified observation for each area.

01

Facility Management

Validate accreditation records, responsibilities, access rosters, training, and required reviews.

Not Applicable
02

SCIF Perimeter

Inspect perimeter integrity, walls, floors, ceilings, openings, and observable damage or modification.

Deficient
03

Doors and Locks

Inspect entrance doors, emergency exits, locking devices, hardware, hinges, and access procedures.

Compliant
04

Intrusion Detection System

Review IDS coverage, testing, maintenance, alarm response, records, and service documentation.

Observation
05

Access Control

Review authorization, visitor control, badges, records, escorts, and access-control equipment.

Not Inspected
06

Telecommunications and Equipment

Review communications equipment, cabling, penetrations, equipment changes, and approved configurations.

Observation
07

Acoustical Protection

Inspect observable conditions affecting acoustical protection and documented mitigation requirements.

Compliant
08

TEMPEST and Technical Security

Confirm applicable CTTA or TEMPEST documentation and identify configuration changes requiring review.

Not Inspected
09

Classified Storage and Destruction

Review storage authorization, containers, end-of-day procedures, and approved destruction capability.

Compliant
10

Emergency Planning

Review emergency plans, contacts, evacuation procedures, exercises, and emergency access provisions.

Not Inspected
11

SOP and Documentation

Verify the SCIF SOP, Fixed Facility Checklist, approvals, waivers, diagrams, and supporting records.

Observation
12

Facility Changes

Identify mission, construction, system, occupancy, co-use, classification, and operational changes.

Compliant
CORRECTIVE ACTION

Inspection findings

High

test2

Open

testt

Corrective action: test

Add inspection finding

INSPECTION ACTIVITY

Audit history

REVALIDATION_CHECKLIST_UPDATED Mission and Classification set to Complete; readiness 37% 2026-09-16 19:33:14
REVALIDATION_CHECKLIST_UPDATED Facility Baseline set to In Progress; readiness 31% 2026-09-16 19:33:11
REVALIDATION_CHECKLIST_UPDATED Accreditation Package Review set to Complete; readiness 31% 2026-09-16 19:33:08
FIVE_YEAR_REVALIDATION_STARTED Revalidation case 7 initiated with readiness 25% 2026-09-16 19:32:57
INSPECTION_FINDING_CREATED High inspection finding created: test2 2026-09-16 19:31:38
INSPECTION_ITEM_UPDATED Classified Storage and Destruction set to Compliant; readiness 71% 2026-09-16 19:31:13
INSPECTION_ITEM_UPDATED Intrusion Detection System set to Observation; readiness 62% 2026-09-16 19:31:09
INSPECTION_ITEM_UPDATED Doors and Locks set to Compliant; readiness 54% 2026-09-16 19:31:06
INSPECTION_ITEM_UPDATED Facility Management set to Not Applicable; readiness 46% 2026-09-16 19:31:01
INSPECTION_ITEM_UPDATED SCIF Perimeter set to Deficient; readiness 38% 2026-09-16 19:30:57
INSPECTION_ITEM_UPDATED Telecommunications and Equipment set to Observation; readiness 34% 2026-09-16 19:30:53
INSPECTION_ITEM_UPDATED SOP and Documentation set to Observation; readiness 24% 2026-09-16 19:30:49
SCIF_DECOMMISSION_REQUEST_CREATED Decommission case 3: Draft -> Draft by p; p 2026-09-15 18:27:13
WAIVER_AO_RECOMMENDED VAR-2026-00004: Submitted -> AO Recommended by k 2026-09-15 18:25:30
WAIVER_SUBMITTED VAR-2026-00004: Draft -> Submitted by abc 2026-09-15 18:25:19
WAIVER_CREATED VAR-2026-00004 created by abc 2026-09-15 18:24:22
INSPECTION_ITEM_UPDATED Facility Changes set to Compliant; readiness 16% 2026-09-15 18:21:30
INSPECTION_ITEM_UPDATED Acoustical Protection set to Compliant; readiness 8% 2026-09-15 18:21:21
SELF_INSPECTION_STARTED Self-inspection 6 created with 12 inspection areas 2026-09-15 18:21:13
WORKFLOW_COMPLETED existing-scif 6: Approved -> Completed by bob 2026-09-15 18:19:48