Annual Self-Inspection

def

demo-scif-001 · 2026-09-15 · In Progress

16% INSPECTION READY
LEAD INSPECTOR bob the builder
AREAS REVIEWED 2 / 12
OPEN FINDINGS 0
COMPLETION GATED
INSPECTION COMPLETION GATE ACTIVE Review all twelve areas and close deficiencies before final human validation.
HUMAN REVIEW GATE

Submit, review, approve, and certify

Open the controlled human review workflow. Inspector and reviewer separation is required.

OPEN HUMAN REVIEW →
INSPECTION MATRIX

Facility review areas

Record the condition and an unclassified observation for each area.

01

Facility Management

Validate accreditation records, responsibilities, access rosters, training, and required reviews.

Not Inspected
02

SCIF Perimeter

Inspect perimeter integrity, walls, floors, ceilings, openings, and observable damage or modification.

Not Inspected
03

Doors and Locks

Inspect entrance doors, emergency exits, locking devices, hardware, hinges, and access procedures.

Not Inspected
04

Intrusion Detection System

Review IDS coverage, testing, maintenance, alarm response, records, and service documentation.

Not Inspected
05

Access Control

Review authorization, visitor control, badges, records, escorts, and access-control equipment.

Not Inspected
06

Telecommunications and Equipment

Review communications equipment, cabling, penetrations, equipment changes, and approved configurations.

Not Inspected
07

Acoustical Protection

Inspect observable conditions affecting acoustical protection and documented mitigation requirements.

Compliant
08

TEMPEST and Technical Security

Confirm applicable CTTA or TEMPEST documentation and identify configuration changes requiring review.

Not Inspected
09

Classified Storage and Destruction

Review storage authorization, containers, end-of-day procedures, and approved destruction capability.

Not Inspected
10

Emergency Planning

Review emergency plans, contacts, evacuation procedures, exercises, and emergency access provisions.

Not Inspected
11

SOP and Documentation

Verify the SCIF SOP, Fixed Facility Checklist, approvals, waivers, diagrams, and supporting records.

Not Inspected
12

Facility Changes

Identify mission, construction, system, occupancy, co-use, classification, and operational changes.

Compliant
CORRECTIVE ACTION

Inspection findings

No inspection findings have been recorded.

Add inspection finding

INSPECTION ACTIVITY

Audit history

SCIF_DECOMMISSION_REQUEST_CREATED Decommission case 3: Draft -> Draft by p; p 2026-09-15 18:27:13
WAIVER_AO_RECOMMENDED VAR-2026-00004: Submitted -> AO Recommended by k 2026-09-15 18:25:30
WAIVER_SUBMITTED VAR-2026-00004: Draft -> Submitted by abc 2026-09-15 18:25:19
WAIVER_CREATED VAR-2026-00004 created by abc 2026-09-15 18:24:22
INSPECTION_ITEM_UPDATED Facility Changes set to Compliant; readiness 16% 2026-09-15 18:21:30
INSPECTION_ITEM_UPDATED Acoustical Protection set to Compliant; readiness 8% 2026-09-15 18:21:21
SELF_INSPECTION_STARTED Self-inspection 6 created with 12 inspection areas 2026-09-15 18:21:13
WORKFLOW_COMPLETED existing-scif 6: Approved -> Completed by bob 2026-09-15 18:19:48
WORKFLOW_APPROVED existing-scif 6: Under Review -> Approved by d 2026-09-15 18:19:37
WORKFLOW_REVIEW_ACCEPTED existing-scif 6: Submitted -> Under Review by d 2026-09-15 18:19:28
WORKFLOW_SUBMITTED existing-scif 6: Draft -> Submitted by bob 2026-09-15 18:19:22
EXISTING_SCIF_REGISTERED Existing SCIF baseline created with 0 uploaded document(s) 2026-09-15 18:18:47